Eiju HorieVice President Director Pt. Sanyo Compressor IndonesiaSanyo
Sanyo
The first reaction to IMPAC supervision was that we were astonish that the IMPAC team could, through their professionalism, collect and analyze data from various sectors with high efficiency and accuracy within such a short period of time. And furthermore, the “Training” and “Monthly Progress” presentations to the Sanyo’s staff was excellent in which I myself had gained much knowledge and experiences that I was not aware during my years of working life.
The very thing about IMPAC System program is that, it is also mean to reform PT. SANYO Compressor Indonesia to achieve cultural assimilation. We could know see significant changes in the attitude and way of thinking of the Local Managers and Frontline Supervisors and Leaders, even though they were not that enthusiastic in the beginning.
Armando B. EscobarPresidentVITARICH
VITARICH
We have achieved significant efficiency and productivity improvements increase in the different plants with the help of your team. Through the application of sound management fundamentals, we are learning to make the changes required to accelerate and perpetuate a working environment of continuous improvement.
There was a positive change in the behavior and attitudes of our managers and all our staff are now much more aware of the objectives and needs of the business and the part they are expected to play in achieving our goals.
Throughout the project, the IMPAC team working with our Management team adopted a strong systematic approach to installing effective systems to manage and control the key elements of our business.
Dian Soekino TheosabrataPresident DirectorFurnilac Primaguna, Pt.
Furnilac Primaguna, Pt.
Just in the first week of the project IMPAC can deliver savings for us, and at week 10 of the project, the savings we got was over what has been guaranteed.
Now after project week 30, I can say our company performs during the project as described below,
- Volume of sales increase 36.6%
- Productivity increase 14.4%
- Project cost recovery 216% compared with 95% promised during analysis
- My people enjoy to fix problems rather than blame someone else
- The production flows smoothly
- I and my executive director can easily monitor the production process
Tadahiko EndoManaging Director, Fujitsu Component (Malaysia) Sdn. Bhd.Fujitsu
Fujitsu
The IMPAC team came into our company with great enthusiasm and commitment, working closely with our managers and supervisors, and leading them to see that problems are opportunities for improvement if analyzed and confronted.
In more tangible terms, IMPAC has also proven to achieve monetary savings, quality improvements and productivity gains. We were aiming for a significant increase in production output and with the stimulus of the IMPAC team, we are well on the way to our target and our management team is confident of achieving it. Quality has also seen a tremendous improvement since IMPAC started working with our people in this area.
Laszlo KovacsPresident- CEOPick Szeged
Pick Szeged
The developed management system meant a training and coaching to the managers at the same time. We consider it important that during trainings persuasion was used as a tool: or managers and supervisors could check the usability of the system before and during implementation through practical examples. This has become a base for long term, continuous and high level utilization.
This way the level of spontaneous actions decreased and we achieved a high level of productive operation.
Cato NaesfeldtA/s Nestle NorgeNESTLE
NESTLE
Summarizing the results and my opinion of the work carried out the following can be said:
- realized savings are on yearly base what we had expected.
- the factory management achieved a better cost awareness.
- the operation is restructured in a more rational way.
- your way of working has been systematic and result-oriented.
- the work carried out by your peoples has been of high quality.
Your people and our factory management have proved that potential savings are possible to realize. With the programmes installed as well as the spirit of the factory management I am confident that what has been achieved, will be permanent or even improve.
Lam Viet TrungChairmanContinent Packaging Corporation
Continent Packaging Corporation
As the result of the work with the IMPAC Team and with the management team as well as supervisors on the floor, we are about to achieve tangible results :
- In Ho Nai factory reduction of machine down time and labour lost time from 40 % to 20 %, defect has been reduced by 14 %, overall productivity has been improved for 17%
- A comprehensive system was developed and installed in order to meet the planned objectives. It also enables Management to pro-actively manage the department performance.
- Improve the communication among the departments
- Better sense of urgency to take corrective action
- Management skills training
Thomas FuhrbergChief Operating Officer Building MaterialsHeidelberg Cement AG.
Heidelberg Cement AG.
We are impressed with the new Operational Excellence Management systems and tools that were developed and installed during the project. Both companies are being completely restructured, final new organizational structures are much more leaner than before.
The installed tools and structures now allow to achieve the same or more results with less resources.
Martin DlouhyManaging DirectorMcDonald’s Ceska republika
McDonald’s Ceska republika
We have achieved an average 15% productivity increase at our 28 restaurants in the Czech Republic and Slovakia through the implementation of IMPAC 10 000 Programme and have been successful in achieving better compliance to our McDonald’s standards and better utilization of management control systems.
The financial results and the savings meet the forecast given.
Steve KimPresident DirectorSamick Indonesia, Pt.
Samick Indonesia, Pt.
At the completion of PT. Samick-IMPAC program, the following are the achievements attained:
- Reduction of material consumption
- Increased productivity
- Savings guarantee had been met 16 times during project time. End of project recovery is 90%.
- Return on investment is 339%
The biggest achievement is the change in thinking, awareness and responsibility of not only the Executives and Managers, but also of the supervisors and the Foremen.
Our supervision is now doing more active direct supervision and less hourly work in managing their respective areas. Management tools have been installed to help distinguish responsibility clearly for each department. No more firefighting, but coordinating together to figure out solutions.
